The infiltration equipment is a general term for infiltration processing machinery. It is generally used in combination with an infiltration agent. It can manufacture vacuum pressure, effectively infiltrate the infiltrant into the micropores, and then heat, solidify, seal, etc. , thus completing the entire process of impregnation processing. When operating the infiltration equipment, like other ordinary machinery, it is necessary to follow the correct operation steps. Today, the infiltration equipment company introduces how to operate the infiltration equipment correctly:
1. The clean workpiece is neatly placed in the cage, the upper layer is pressed with a plastic stencil, and the plastic mesh is fixed with fine wire.
2. Put the cage into the infiltration tank → close the tank lid → lock the tank lid → place the safety stop → close the pressure relief valve → open the vacuum pump → open the vacuum valve → vacuum to -0.099Mpa, close the vacuum valve → Close the vacuum pump → hold the pressure for 15 minutes → open the inlet and outlet valve → immediately close the inlet and outlet valve after the glue has submerged the workpiece → hold the pressure for 15 minutes → open the pressure relief valve, press the pressure to 0 position, close the pressure relief valve → open the pressure valve → When the pressure reaches 0.40Mpa, close the pressure valve → hold pressure for 15 minutes → open the pressure relief valve, close the pressure relief valve when the pressure is relieved to 0.2Mpa → open the inlet and outlet valve, and return the liquid to the liquid storage tank to close the inlet and outlet valve → Open the pressure relief valve until the pressure returns to 0 position → remove the safety stop → open the locking can lid → open the cover → remove the cage
3. Put the cage into the dryer → close the cover → turn on the dry motor → automatically forward, stop, reverse, stop → open the cover → take out the cage
4. Put the cage into the cleaning tank I → open the inlet valve → open the intake valve → electric hoist to make the cage up and down in the cylinder water for about 5 times → close the intake valve → take out the cage
5. Place the cage into the cleaning tank II → open the intake valve → electric hoist to make the cage up and down 5 times in the water in the cylinder → close the intake valve → close the inlet valve → remove the cage
6. Place the cage in the hot water curing tank → open the cover → time 30 minutes after the temperature reaches 93 °C → open the cover → take out the cage